What inspections do I need from Ash Creek for a new build?

By October 19, 2022
Category: General FAQs

Ash Creek requires two separate inspections. Both inspections will need to be done before signatures for occupancy will be given.

A Lateral Inspection is done by one of our inspectors before the lateral line is buried.

Then, a Cleanout Inspection is done to ensure the sewer cleanout(s) are installed correctly.

Please see the Sewer Cleanout Details page for photos and details about the sewer cleanout. Keep in mind that if any inspection is not ready, is incomplete, or fails there is a $50 re-inspection fee that will need to be paid at our office before our inspector can re-inspect.